GRIDRADARGB SYSTEM INTELLIGENCE
CONNECTINGLIVE SYSTEM WARNING FEED
Grid highlights
GRID OVERVIEW / MORNING BRIEFING

Grid highlights.

Recent system notices and measured frequency, alongside generating-capacity, wind and solar forecasts and potential issues for the next 24 hours.

Forecast: next 24 hours · UK timeFetching published forecasts…
LATEST SYSTEM NOTICE
Checking…
LAST FREQUENCY EXCURSION
Checking…
LOWEST SPARE CAPACITY
Checking…
REPORTED GENERATOR RESTRICTIONS
Checking…
02 / GENERATOR CAPACITY

Offline vs installed capacity

Peak concurrent generator restrictions disclosed through REMIT during the next 24 hours, compared with annual published installed capacity.

Reported offline at peak—
Published installed—
Contextual percentage—

Waiting for outage reports.

03 / WIND & SOLAR

Wind and solar outlook

NESO's forecast embedded wind and solar generation for the next 24 hours. Transmission-connected generation is not included in these figures.

Embedded wind · average—

Loading forecast…

Embedded solar · peak—

Loading forecast…

CONTINUOUS MONITOR / GREAT BRITAIN

When the grid needs help.

Explore published electricity margin warnings, emergency assistance notices and demand-reduction alerts. Rolling historical coverage, updated automatically.

Elexon BMRS · official SYSWARN noticesLOOKBACK · LAST 30 DAYS
LOOK BACK
Not checked yet
Fetching published notices from Elexon…
NOTICE DAY SELECTOR Waiting for the feed…
UK LOCAL TIME · BST / GMT
i

How to read this dashboard: a published warning or emergency assistance request is evidence of operational action — not a quantified probability of blackouts. An assistance volume is not equivalent to a national power shortfall. A day with several notice updates is counted as one notice day.

Fetching metrics…
INCIDENT EVIDENCE / FOUR INDEPENDENT CHECKS

How stressed was the system?

Loading the latest notice day…

Waiting for published incident data.

Warning notices, system frequency and de-rated margin forecasts describe different aspects of the electricity system. They cannot be combined into a reliable probability of power cuts.

01 / HISTORY

Notice activity over time

Published notices per day, not power outages

Margin / demand Emergency assistance

Click any highlighted bar to inspect notices from that date. Every bar represents published messages, not independent incidents.

02 / NOTICE CONTEXT

What do the notices mean?

↗

The feed can establish when warnings were issued. It cannot, on its own, measure how close the grid came to losing supply.

03 / PUBLISHED RECORDS

Latest relevant notices

Source: Elexon BMRS SYSWARN. Times shown in UK local time.

04 / MEASURED SYSTEM FREQUENCY

How close to frequency limits?

50 Hz nominal · 49.8 Hz lower operational reference · 49.5 Hz statutory lower limit

↻ Loads when a notice day is selected
∿Waiting for a notice day

Frequency readings are fetched automatically for the selected day.

Automatic measured frequency query; no synthetic measurements.

Frequency is a national measure, while some incidents are caused by regional transmission constraints. A frequency trace alone cannot prove how close a region came to losing power.

05 / HISTORICAL REFERENCE

All notice days in the last 30 days

Every matching UK publication date in your selected lookback, sourced from the live Elexon SYSWARN feed. Select a day above or here to examine its frequency and margin data.

Loading
Loading published event history…
06 / SOURCES & METHODS

Where the data comes from

PUBLIC OFFICIAL SOURCES
Elexon LOLPDRM de-rated margin forecast ↗ — shown for the selected warning only where published, not a measure of actual reserve or regional transmission headroom.
ⓘ

Method: results are selected using the publication timestamp, not the period to which a warning relates. Related notice updates are grouped by their UK calendar date; this is not a formal incident-level grouping. Automatic refresh runs every five minutes while this page is open; it is not a background alerting service. Partial outages are labelled and never silently treated as zero events. No invented measurements, assistance volumes or blackout probability are shown.

LIVE GRID / MEASURED CONDITIONS

What is actually happening?

Observed frequency, transmission demand, metered generation and Britain's combined net interconnector flow. No warning forecasts on this tab, and no invented blackout-risk percentage.

Official Elexon data · waiting for measurements
OBSERVATION WINDOW
CUSTOM DATE RANGE · UK local time (BST/GMT) · past 365 days
Showing the last 6 hours · UK time
Open this tab to load the latest Elexon measurements.
Waiting for complete settlement periods.
Waiting for measured data.
ELECTRICITY ACCOUNTING

Where the electricity goes

Gross imports and exports, pumping, power-station auxiliary use, and a like-for-like time window.

Waiting for data.
01 / MEASURED FREQUENCY

How close did frequency get?

Observed hertz, not predicted power cuts

OBSERVATIONS ONLY
Waiting for frequency

Measured frequency will appear here.

Awaiting observations
02 / OBSERVED POWER FLOWS

Demand, generation & net interconnector flow

Fixed −10 to 40 GW axis · observed snapshots · negative interconnector flow = net exports

Transmission demand Metered generation Net imports (+) / exports (−)
Awaiting observed demand, generation and interconnector readings.
03 / GENERATION SOURCES

Sources of electricity

Metered hydro and other fuels · estimated embedded solar and wind · A–Z

Waiting for generation data…
04 / HOW TO READ THE DATA

Actual measurements ≠ a complete blackout-risk assessment

Frequency is a direct system-wide observation; the gap to 49.5 Hz and the 48.8 Hz disconnection reference is measurable. It is not a reliable countdown to grid collapse. Demand is metered initial transmission-system outturn, not a forecast. Metered generation covers transmission-connected sources. Embedded wind and solar estimates are shown separately and excluded from the metered balance. Net interconnector flow sums signed published connector readings for the same settlement period; importing power does not itself mean the UK is short of supply. The accounting section compares gross imports with transmission demand and separates exports, pumping and station use when they are published.

For the fuller picture of blackout risk, publicly accessible measurements do not reliably reveal available frequency-response reserves, all regional transmission constraints or the probability of load shedding. Missing and delayed data are labelled, never treated as zero or proof the grid is safe.

FORECAST / FUTURE SYSTEM PRESSURE

Where could the grid tighten next?

14-day outlook from published electricity forecasts. Wind, solar and spare generating capacity are shown alongside known availability data. This is a forward-looking evidence dashboard

Loads when you open Forecast
Open this tab to load the forecast feeds.
01 / FORWARD OUTLOOK

The next 14 days

Daily published spare generating capacity and renewable forecasts, where available · UK dates

FORECAST
Spare generating capacity Wind (embedded) Solar (embedded)

Waiting for forecast feeds.

02 / DEMAND & GENERATION

How much electricity is expected to be needed?

Select Forecast to load published demand, generation and margin forecasts.

03 / GENERATOR AVAILABILITY

Power stations & planned maintenance

Published generation-availability outlook; planned outages affect the usable capacity

Waiting for forecast feed.

Available versus installed capacity

Waiting for published capacity.

How the availability forecast has changed

Select a forecast date.

Available capacity is not electricity actually generated. A drop in declared usable output may reflect outages or other restrictions; it does not, by itself, identify a specific maintenance event.

04 / ASSET RESTRICTIONS

Planned outages and unexpected restrictions

REMIT disclosures overlapping the selected day · separate generator and interconnector reports

Open Forecast and select a day to load outage reports.

When is the most capacity offline?

Waiting for outage data
Reported generators offline at peak—
Published installed generating capacityChecking…
Offline vs installed capacity—

Installed capacity and REMIT disclosures have different reporting coverage.

Generating units

Awaiting REMIT data.

Interconnectors

Other reports that could not be classified

These notifications cannot be subtracted from the operating-margin forecast without double-counting.

Overseas exportable surplus remains unknown: a link being technically available does not guarantee neighbouring generators have spare power or that commercial imports will be scheduled. ENTSO-E European system information ↗

04 / SOURCES & LIMITATIONS

What goes into this outlook?

Elexon · operating margin (2–14 days) NESO · embedded wind and solar forecasts ↗ Elexon · metered wind forecast Elexon · usable generating capacity (2–14 days) Elexon · 2–14-day National Demand forecast Elexon · REMIT event-date outage reports

These inputs have different reporting boundaries and forecast horizons. Lower published spare generating capacity indicates less forecast generation headroom under that report's assumptions, but it is not a quantified blackout likelihood or a full assessment of regional transmission-security risks. Missing or stale feeds are labelled rather than filled with guesses. UTC is used for API timestamps; day labels are shown in UK local time.